Each turbine installation is preceded by detailed guidelines for the assembly team based on a previously performed audit and design. As part of turbine assembly, we perform:
The installation of a wind turbine requires a building permit from the competent authority
If the turbine's power exceeds the contracted power with the power plant, you must apply for connection conditions.
The completed installation of the wind turbine must result in reporting the generating device to the appropriate operator in order to settle the electricity produced.
Phone : +48 502 592 181
contact@vertienergy.com